7
mirror of https://github.com/uw-midsun/hardware.git synced 2024-11-27 08:10:30 +00:00
uw-midsun-hardware/MSXII_PreChargeController/Project Outputs for PreCharge/Fabrication Files/PreCharge_4.0.GBP
Taiping Li 75d27df6f8
HW-111 Pre-Charge Rev 4 + Motor Interface Rev 3 (#73)
* ELEC-364 Changed optoisolator, IN+ to one of the AND inputs instead of IN-, connected LATCH_OUT to inverter, changed R7 and R9 to 1208 resistors, added mosFET switching circuit between LATCH_OUT and optoisolator, removed mosFET switching circuit between AND gate and RS Latch

* HW-111 Precharge Rev 4.0
- Changed HV directives to use a mask instead
- Removed 4 way crosses from the schematic
- Changed opto-isolator to low side switching and removed the P-FET

TODO
- Update library from master
- Change comprarator to TLV1701
- Look into removing S-R latch
- Redo layout to include motor interface (controller board + MCP2515)
- Look into adding thermistors to the pre-charge and discharge
resistors?

* HW-111 Pre-Charge Rev 4
- Updated libraries from master

* HW-111 Motor Interface Rev 4
- Modified pre-charge circuit to remove an inverter
- Added fuse holder
- Changed to a hierchael design for readablitiy
- Combined most of motor interface and pre-charge

TODO:
- Review schematic and fix designators

Library changes
+ FUSE 3A 250VAC/450VDC RADIAL
+ FUSE HOLDER PC-TRON RADIAL
+ IC OPTOISOLATOR HCPL-0211 8-SOIC

* HW-111 Motor Controller Interface/Pre-Charge Rev 4
- Fixed net naming on the controller board interface
- Reannotated schematic

* HW-111
- Connected ISO_GND between schematic sheets
- Fixed footprint links for Blue LED, Diode 60V 3A, and 3POS ULTRA-FIT

* HW-111 Motor Controller Interface/Pre-Charge Rev 4
- Changed LED on ISO_12V to blue

* HW-111
- Finished preliminary layout for isolated section

TODO
- Review placement
- Finish placement for LV section
- Consider adding a common mode choke + filtering caps to CAN
- Fix PESD1CAN footprint

* HW-111
- Fixed footprint for PESD1CAN TVS diode
- Began routing. Have 18/84 nets remaining

* ELEC-364 Pre-charge rev 4
- Continued routing

* HW-111
- Finished preliminary routing for PCB

TODO
- Add test points to PCB
- Add labels in silkscreen for connectors, LED, HV symbol etc
- Layout review

* HW-111 Pre-Charge Rev 4
- Finished layout, no DRCs

Library
- Added DIODE TVS 160V to schematic and footprint libraries

* Generated gerbers, still have to generate the BOM and PDFs

* ELEC-364 Pre-Charge Rev 4 + Motor Interface
- Updated FUSE HOLDER PCS to include supplier part number and parameters
- Updated BOM

* Updated libraries from master
2019-01-26 17:49:31 -05:00

33 lines
416 B
Plaintext

G04*
G04 #@! TF.GenerationSoftware,Altium Limited,Altium Designer,18.1.9 (240)*
G04*
G04 Layer_Color=128*
%FSLAX25Y25*%
%MOIN*%
G70*
G01*
G75*
%ADD17R,0.05315X0.18110*%
%ADD18R,0.42520X0.37008*%
%ADD158R,0.08898X0.08504*%
%ADD159R,0.06693X0.09843*%
D17*
X70787Y325984D02*
D03*
X50787D02*
D03*
D18*
X60787Y362008D02*
D03*
D158*
X29921Y342715D02*
D03*
Y362010D02*
D03*
D159*
X31496Y19685D02*
D03*
Y35433D02*
D03*
M02*