#9 Fix SPI MOSI/MISO pin swap error 🐛
AllSpiceAlice/Altium-Demo-2024-Q2
#18 Fix voltage regulator layout
AllSpiceAlice/Altium-Demo-2024-Q2
#2 Fix vias underneath U1000
AllSpice-Demos/KiCAD-Arduino-R3-Demo
Reference: AllSpiceAlice/Altium-Demo-2024-Q2#11
Loading…
Reference in New Issue
No description provided.
Delete Branch "develop"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Resolved Issues
Description
V3 adds more protection to external cables/sensors and improves data transmission
Resolves manufacturing and customer issues from V2
EndStops.SchDoc
Connectors.SchDoc
Fans.SchDoc
Microcontroller.SchDoc
Motor.SchDoc
Power.SchDoc
Thermisters.SchDoc
Thermocouples.SchDoc
USB.SchDoc
Design Review Checklist
Process
System
Components
Schematics
3.3V
vs+3.3V
)PCB
fab
layerCan you also re-check cable connections for interference?
@daniel , I've checked the mounting holes. They match the enclosure and mounting hardware.
The cable/connector interference is clear. We're all set!
E-Stop
@daniel, can we remove the E-Stop channel? it's not hooked up to an interrupt and can't actually e-stop.
Solution
???
@RevaReviewa , I've removed the E-Stop endstop, as asked.
@PavelInPurchasing, thank you for pointing that out. I've replaced it with the diode from the Vulcan line. Twice the performance at half the cost!
@RevaReviewa, that's a great find! I've notified the firmware team.
The FW changes should be done and out of testing by this afternoon. I'll attach the changes when they're ready.
@Daniel has made all needed changes to components.
BOM is clear and COGS is within goals. Great job team!
All mounting holes are correct.
Passes interference test with new enclosure.